The Farmer Takes A Wife (this one)

Friday, April 21, 2006

Our New Driveway





Here is the culvert DH placed in the bottom section of the field where the water accumulates. He says he needs to bring in about 6 truckloads of rock (that we picked out of the field- good thing it comes in handy) to build up the driveway enough. Then once it is built in, we will bring in some dirt and then "professional" gravel. This is the first thing we need to get done before we can build.



Here is the driveway all the way down (or up, I should say). We need to get the driveway done, a permit to pave the first 10 feet off the road, septic in, water line down the lane, power up the lane, and telephone line up the lane. Then the builders will have all they need to get going. Who knows how long all this will take?!

0 Comments:

Post a Comment

<< Home

Internet Providers Home Security